Status
The photos show the new roof from the crane in July 2026 and the state in October 2026: façade finished, roof edge clad in metal, flats being fitted out. The surroundings are deliberately blurred.
Zurich · New build
New
New roof between neighbouring houses and roof terraces: underlay, roof windows and dormers are in place, and almost everything goes up by crane.
The photos show the new roof from the crane in July 2026 and the state in October 2026: façade finished, roof edge clad in metal, flats being fitted out. The surroundings are deliberately blurred.