PHILIP.SWISS
← All projects

New build · SIA 53

New apartment building with clinker facade

Pre-acceptance inspections in October 2026: interior fit-out complete, landscaping still under way.

Apartment building with dark red clinker facade and continuous balconies
Type
New build
Use
Residential
Role
Senior project manager on the client and investor side
Context
As an employee
SIA phases
53
Period
2026
Further details
Details on request
Services
  • Quality assurance
  • Oversight of the design-and-build contractor
  • Pre-acceptance and acceptance inspections

Status

The photos show the state at the pre-acceptance inspections in October 2026. Apartments and bathrooms are fitted out, the landscaping is still under way.

Side facade clad in dark red clinker, landscaping under way

Brick facade, landscaping underway

Kitchen and living area with terrazzo island and herringbone oak parquet

Kitchen with terrazzo island

Bathroom with freestanding bathtub and double washbasin

Bathroom with freestanding tub

Guest toilet with freestanding marble washbasin

Guest WC with marble basin

Open kitchen with island and oak parquet

Open kitchen, oak parquet

Dark built-in cabinets and shelving, herringbone parquet

Built-ins made to measure

Shower with glass enclosure and illuminated mirror

Shower with glass screen

Garden side with balconies, landscaping under way

Garden side, landscaping underway